toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Compression Check > < Component Inspection|Page 2015
Page 2
background image

c. Install the 4 oil control valves with the 4 bolts.

Torque: 9.0 N.m (92 kgf.cm, 80 in.*lbf)

NOTE:  Make sure that the O-ring is not cracked or jammed.

d. Connect the 4 oil control valve connectors.

2. INSTALL INTAKE AIR SURGE TANK ASSEMBLY.
3. INSTALL ENGINE ASSEMBLY

a. Install the engine.

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. CHECK FOR ENGINE OIL LEAKS

a. Start the engine, and check that there are no oil leaks.

Compression Check > < Component Inspection|Page 2015