Sequoia 2WD V8-4.6L (1UR-FE) (2010)
11. INSTALL FRONT DOOR CHECK ASSEMBLY
(a) Apply MP grease to the sliding areas of the door check.
(b) Install the front door check onto the door panel with the 2 nuts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
(c) Apply adhesive to the threads of the bolt.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
(d) Install the front door check onto the body panel with the bolt.
Torque : 29 Nm (296 kgf-cm, 21 ft-lbf)
12. INSTALL FRONT NO. 1 DOOR STIFFENER CUSHION
(a) Engage the 2 clips and install the front No. 1 door stiffener cushion.
13. INSTALL FRONT DOOR FRAME REAR LOWER SUB-ASSEMBLY
(a) Install the front door frame rear lower sub-assembly with the 2 bolts.