Sequoia 2WD V8-4.7L (2UZ-FE) (2003)
h. Turn SST (B), and remove SST (A and B).
i.
Place the brush holder on the coil assembly with the pin facing upward.
NOTE: Be careful of the holder Installation direction.
j.
Install the 2 screws.
Torque: 1.8 N.m (18 kgf.cm, 16 in..lbf)
4. INSTALL REAR END COVER
a. Install the terminal insulator.
NOTE: Be careful of the terminal insulator installation direction.
b. Install the end cover with the 3 nuts.