Sequoia 4WD V8-4.6L (1UR-FE) (2010)
(f) Engage the 4 clamps to install the amplifier antenna.
(g) Install the bolt.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(h) Connect the connector.
(i) Install the amplifier antenna with the bolt.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
(j) Connect the connector.
(k) Install the washer hose and the amplifier antenna.
(l) Connect the connector.
(m)Engage the 3 clamps to install the roof wire.
(n) Connect the connector.
2. INSTALL ROOF HEADLINING ASSEMBLY (w/ Rear Seat Entertainment System)