Sequoia 4WD V8-4.7L (2UZ-FE) (2006)
Variable Valve Timing Actuator: Testing and Inspection
On-Vehicle Inspection
ON-VEHICLE INSPECTION
1. INSPECT CAMSHAFT TIMING OIL CONTROL VALVE
a. Remove the throttle body cover.
b. Remove the intake air connector.
c. Disconnect the oil control valve connector.
d. Using an ohmmeter, measure the resistance between the terminals.
Standard Resistance:
6.9 to 7.9 ohms at 20 degree C (68 degree F)
If the resistance is not as specified, replace the valve.
e. Reconnect the oil control valve connector.
f.
Reinstall the intake air connector.
g. Reinstall the throttle body cover.