Sequoia 4WD V8-4.7L (2UZ-FE) (2006)
Blower Motor: Service and Repair
Blower Motor Controller
REMOVAL
1.
REMOVE GLOVE COMPARTMENT DOOR ASSEMBLY
2.
REMOVE INSTRUMENT PANEL LOWER FINISH PANEL NO.2
3.
REMOVE INSTRUMENT LOWER COVER
4.
REMOVE INSTRUMENT PANEL LOWER FINISH PANEL LH
5.
REMOVE NO.4 HEATER TO REGISTER DUCT
6.
REMOVE BLOWER MOTOR CONTROLLER
a.
Disconnect the connector.
b.
Remove the 2 screws and blower motor linear controller.
INSTALLATION
1.
INSTALL BLOWER MOTOR CONTROLLER
a.
Install the blower motor linear controller with the 2 screws.
b.
Connect the connector.
2.
INSTALL NO.4 HEATER TO REGISTER DUCT
3.
INSTALL INSTRUMENT PANEL LOWER FINISH PANEL LH
4.
INSTALL INSTRUMENT LOWER COVER
5.
INSTALL NO.2 INSTRUMENT PANEL LOWER FINISH PANEL
6.
INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY