Sequoia 4WD V8-5.7L (3UR-FE) (2009)
(a) Engage the claw and install the rear evaporator temperature sensor.
(b) Engage the clamp to the rear cooling unit.
3. INSTALL REAR COOLING UNIT EXPANSION VALVE
(a) Using a 4 mm hexagon wrench, install the rear cooling unit expansion valve with the 2 hexagon bolts.
Torque: 3.5 Nm (36 kgf-cm, 31 in-lbf)
(b) Install the grommet.
(c) Engage the 3 claws and install the plate.
4. INSTALL BLOWER MOTOR CONTROL