Sequoia 4WD V8-5.7L (3UR-FE) (2009)
4. INSTALL AIR CLEANER ASSEMBLY See: Engine, Cooling and Exhaust/Cooling System/Water Pump/Service and Repair/Installation
5. PERFORM INITIALIZATION
(a) Perform initialization procedures See: Testing and Inspection/Programming and Relearning.