toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Main Relay (Computer/Fuel System)|Locations|Page 3639 > < Main Relay (Computer/Fuel System)|Locations|Page 3637
Page 1
background image

Main Relay (Computer/Fuel System): Testing and Inspection

3UR-FE ENGINE CONTROL: RELAY: ON-VEHICLE INSPECTION

ON-VEHICLE INSPECTION

1. INSPECT CIRCUIT OPENING RELAY (C/OPN)

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

If the result is not as specified, replace the circuit opening relay.

2. INSPECT INTEGRATION RELAY (IG2)

(a) Measure the resistance of the IG2 MAIN fuse.

(1) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

If the result is not as specified, replace the IG2 MAIN fuse.

(b) Measure the resistance of the ignition relay No. 2 (IG2) circuit.

(1) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

If the result is not as specified, replace the integration relay.

Main Relay (Computer/Fuel System)|Locations|Page 3639 > < Main Relay (Computer/Fuel System)|Locations|Page 3637