Sequoia 4WD V8-5.7L (3UR-FE) (2009)
Variable Valve Timing Actuator: Service and Repair
Removal
3UR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: REMOVAL
REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Removal
2. REMOVE AIR CLEANER HOSE ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Removal
3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)