Sequoia 4WD V8-5.7L (3UR-FE) (2009)
Canister Purge Control Valve: Service and Repair
Installation
3UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
(a) Install the No. 1 vacuum switching valve assembly with the bolt.
Torque: 21 Nm (214 kgf-cm, 16 ft-lbf)
(b) Connect the connector.
2. CONNECT PURGE LINE HOSE
(a) Connect the 2 hoses.
HINT: Turn the clip claw to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Intake Manifold/Service and Repair/Installation