Sequoia 4WD V8-5.7L (3UR-FE) (2009)
Alternator: Service and Repair
Installation
3UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
INSTALLATION
1. INSTALL GENERATOR ASSEMBLY (for 130 A, 150 A Type)
(a) Install the generator with the 3 bolts and nut.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Connect the generator connector.
(c) Connect the generator wire with the nut.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(d) Install the terminal cap.
(e) Install the harness bracket to the generator with the bolt.
Torque: 31 Nm (316 kgf-cm, 23 ft-lbf)
2. INSTALL GENERATOR ASSEMBLY (for 180 A Type)
(a) Install the generator with the 3 bolts and nut.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Connect the generator connector.
(c) Connect the generator wire with the nut.
Torque: 12 Nm (122 kgf-cm, 9 ft-lbf)