Sequoia 4WD V8-5.7L (3UR-FE) (2009)
Auxiliary Power Outlet Switch: Service and Repair
Installation
POWER OUTLETS (INT): INVERTER MAIN SWITCH: INSTALLATION
INSTALLATION
1. INSTALL INVERTER MAIN SWITCH
(a) Engage the 2 claws and install the inverter main switch.
(b) Connect the connector.
2. INSTALL NO. 2 SWITCH HOLE BASE
(a) Engage the 4 claws and install the No. 2 switch hole base.