Sequoia 4WD V8-5.7L (3UR-FE) (2009)
(a) Coat 4 new O-rings with ATF.
(b) Install the 4 O-rings, transmission oil cooler thermostat and transmission oil cooler to the automatic transmission.
(c) Temporarily install the bolt A.
(d) Install the 2 bolts B and tighten them to the specified torque. Then tighten bolt A to the specified torque.
Torque: 21 Nm (214 kgf-cm, 16 ft-lbf)
(e) Connect the 2 No. 2 transmission oil cooler hoses to the transmission oil thermostat.
-
Make sure the pinching portion of each clip is facing the direction shown in the illustration.
-
Make sure the paint portion of each hose is facing outward.
3. CONNECT WATER BY-PASS PIPE ASSEMBLY
(a) Connect the 2 water by-pass hoses with the 2 clips and install the water by-pass pipe with the bolt.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
HINT: Make sure the pinching portion of each clip is facing the direction shown in the illustration.
4. INSTALL FRONT EXHAUST PIPE ASSEMBLY See: Engine, Cooling and Exhaust/Exhaust System/Exhaust Pipe/Service and