toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 1575 > < Valve Clearance|Specifications|Page 1573
Page 9
background image

NOTICE:  
^

Remove any oil from the contact surface.

^

Install the cylinder head cover within 3 minutes after applying seal packing.

^

Do not start the engine within 2 hours after installing.

b. Install the cylinder head cover with the 9 bolts. Tighten the bolt uniformly in several steps.

Torque: 8.0 Nm (80 kgf-cm, 71 inch lbs.) 

c. Install the engine wire harness with the 3 nuts.

Torque: 8.4 Nm (85 kgf-cm, 74 inch lbs.) 

21. INSTALL CYLINDER HEAD COVER SUB-ASSY LH

a. Apply seal packing to the cylinder head as shown in the illustration.

Seal packing: Part No. 08826-00080 or equivalent

NOTICE:  
^

Remove any oil from the contact surface.

^

Install the cylinder head cover within 3 minutes after applying seal packing.

^

Do not start the engine within 2 hours after installing.

b. Install the cylinder head cover with the 9 bolts. Tighten the bolt uniformly in several steps.

Torque: 8.0 Nm (80 kgf-cm, 71 inch lbs.) 

c. Using an E6 torx socket wrench, install the engine wire harness protector with the 2 bolts.

Torque: 8.4 Nm (85 kgf-cm, 74 inch lbs.) 

22. INSTALL IGNITION COIL ASSY

Torque: 8.0 Nm (80 kgf-cm, 71 inch lbs.) 

23. INSTALL INTAKE AIR SURGE TANK

a. Install a new gasket to the intake air surge tank.
b. Install the intake air surge tank and the emission control valve bracket with the 2 nuts.

Torque: 28 Nm (286 kgf-cm, 21 ft. lbs.) 

c. Using a socket hexagon wrench 8, tighten the 4 bolts.

Torque: 28 Nm (286 kgf-cm, 21 ft. lbs.) 

d. Install the surge tank stay No. 2 with the 2 bolts.

Torque: 20 Nm (199 kgf-cm, 14 ft. lbs.) 

e. Install the surge tank stay No. 1 with the 2 bolts.

Torque: 20 Nm (199 kgf-cm, 14 ft. lbs.) 

f.

Install the engine hunger No. 1 with the 2 bolts.
Torque: 20 Nm (199 kgf-cm, 14 ft. lbs.) 

g. Install the pressure feed tube with the 2 nuts.

Torque: 7.8 Nm (80 kgf-cm, 69 inch lbs.) 

h. Connect the ventilation hose.
i.

Connect the union to check valve hose.

j.

Connect the water by-pass hose No. 2.

k. Connect the water by-pass hose No. 3.
l.

Connect the throttle motor connector.

24. INSTALL EMISSION CONTROL VALVE SET

Torque: 8.0 Nm (82 kgf-cm, 71 inch lbs.) 

25. INSTALL AIR CLEANER CAP SUB-ASSY 
26. CONNECT VACUUM HOSE
27. INSTALL V-BANK COVER SUB-ASSY

a. Fit the 2 retainers and install the V-bank cover.
b. Using a socket hexagon wrench 5, tighten the 3 nuts.

Torque: 7.9 Nm (81 kgf-cm, 70 inch lbs.) 

28. INSTALL COWL TOP PANEL SUB-ASSY OUTER FRONT 
29. INSTALL COWL TOP TO COWL BRACE INNER NO.1 

Valve Clearance|Specifications|Page 1575 > < Valve Clearance|Specifications|Page 1573