Sienna FWD V6-3.5L (2GR-FE) (2009)
Variable Valve Timing Actuator: Testing and Inspection
On-Vehicle Inspection
2GR-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: ON-VEHICLE INSPECTION
ON-VEHICLE INSPECTION
1. INSPECT CAMSHAFT TIMING CONTROL VALVE ASSEMBLY
(a) Connect the Techstream to the DLC3.
(b) Turn the ignition switch to ON.
(c) Start the engine and warm it up.
(d) Enter the following menus: Powertrain / Engine and ECT / Active Test.
(e) Check the engine speed when the OCV (camshaft timing oil control valve) is operated by the Techstream.
OK: