Sienna FWD V6-3.5L (2GR-FE) (2009)
Variable Valve Timing Actuator: Service and Repair
Installation
2GR-FE ENGINE CONTROL SYSTEM: CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY: INSTALLATION
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2 Exhaust Side)
(a) Apply a light coat of engine oil to the new O-ring and install it to the camshaft timing oil control valve.
(b) Install the camshaft timing oil control valve assembly with the bolt.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
(c) Connect the camshaft timing oil control valve assembly connector.
2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2 Intake Side)
(a) Apply a light coat of engine oil to the new O-ring and install it to the camshaft timing oil control valve.
(b) Install the camshaft timing oil control valve assembly with the bolt.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
Connect the camshaft timing oil control valve assembly connector.
3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1 Exhaust Side)