Sienna FWD V6-3.5L (2GR-FE) (2009)
(d) Connect the 3 vacuum hoses.
5. ADD ENGINE COOLANT See: Engine, Cooling and Exhaust/Cooling System/Coolant/Service and Repair
6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
7. INSPECT FOR COOLANT LEAK See: Engine, Cooling and Exhaust/Cooling System/Testing and Inspection
8. INSTALL NO. 1 ENGINE UNDER COVER
9. INSPECT FOR FUEL LEAK See: Testing and Inspection
10. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Installation
11. INSTALL COWL TOP PANEL SUB-ASSEMBLY OUTER FRONT
(a) Install the 7 bolts and the cowl top panel sub-assembly outer front.
Torque: 7.5 Nm (76 kgf-cm, 66in-lbf)
(b) Connect the fuel pump resistor connector.
(c) Connect the wire harness clamp.
12. INSTALL NO. 1 COWL TOP TO COWL BRACE INNER
(a) Install the 2 bolts and the No.1 cowl top to cowl brace inner.
Torque: 7.5 Nm (76 kgf-cm, 66in-lbf)
13. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY See: Wiper and Washer Systems/Wiper Motor/Service and Repair/Front
Wiper Motor/Installation
14. INSTALL FRONT WIPER ARM LH See: Wiper and Washer Systems/Wiper Motor/Service and Repair/Front Wiper Motor/Installation
15. INSTALL FRONT WIPER ARM RH See: Wiper and Washer Systems/Wiper Motor/Service and Repair/Front Wiper Motor/Installation