toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Sunroof / Moonroof Limit Switch > < Sunroof / Moonroof Relay|Locations|Page 7040
Page 1
background image

Sunroof / Moonroof Circuit Breaker: Testing and Inspection

INSPECT CIRCUIT BREAKER OPERATION

a. With the sliding roof in the fully opened position, hold the sliding roof switch in "OPEN" position and check that there is a circuit breaker

operation noise within 10 to 60 seconds.

b. With the sliding roof in fully opened position, hold the sliding roof switch in "TILT UP" position and check that the sliding roof begins to close

within 60 seconds.
If operation is not as specified, replace the motor.

Sunroof / Moonroof Limit Switch > < Sunroof / Moonroof Relay|Locations|Page 7040