Solara V6-3.3L (3MZ-FE) (2004)
Control Assembly: Testing and Inspection
AIR CONDITIONING PANEL SUB-ASSY
INSPECTION
1. INSPECT AIR CONDITIONING PANEL SUB-ASSY (MANUAL AIR CONDITIONING)
a. Disconnect the connectors from the air conditioning panel sub-assy and inspect the connectors on the wire harness side, as shown in the chart.
If the circuit is as specified, replace the air conditioning panel sub-assy with a new one. If the circuit is not as specified, inspect the circuits
connected to other parts.