toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Variable Valve Timing Actuator > < Transmission Position Switch/Sensor, A/T|Adjustments|Page 3600
Page 4
background image

k) Connect the park/neutral position switch connector.

10. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SHIFT

a) Connect the control cable to the control shaft lever with the nut.

Torque: 15 Nm (153 kgf-cm, 11 ft. lbs.) 

b) Connect the control cable with a new clip to the bracket.

11. INSTALL ENGINE UNDER COVER LH
12. INSTALL INTAKE AIR RESONATOR SUB-ASSY
13. INSTALL AIR CLEANER HOSE NO.1
14. INSTALL AIR CLEANER ASSY 
15. INSTALL ENGINE COVER SUB-ASSY NO.1
16. INSTALL BATTERY
17. ADJUST SHIFT LEVER POSITION 
18. INSPECT SHIFT LEVER POSITION 
19. INSPECT PARK/NEUTRAL POSITION SWITCH ASSY
20. PERFORM INITIALIZATION 

Variable Valve Timing Actuator > < Transmission Position Switch/Sensor, A/T|Adjustments|Page 3600