toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Chain|Specifications|Page 1812 > < Timing Chain|Specifications|Page 1810
Page 14
background image

(c)

Align the mark links (yellow colored links) with the timing marks of the sprocket as shown in the illustration.

(d) Insert the sprockets with chain to the crankshaft and oil pump shaft.
(e)

Temporarily tighten the oil pump driven sprocket with the nut.

(f)

Insert the damper spring into the adjusting hole, and install the chain tensioner plate with the bolt. 
Torque: 12 Nm (122 kgf-cm, 9 ft. lbs.) 

(g) Align the adjusting hole of the oil pump driven sprocket with the groove of the oil pump.
(h) Put a bar ([diameter]4 mm (0.16 inch)) in the adjusting hole of the oil pump driven sprocket to temporarily lock the sprocket in position.

Install the nut.
Torque: 30 Nm (301 kgf-cm, 22 ft. lbs.) 

(i)

Rotate the crankshaft counterclockwise by 90°, and align the crankshaft key to the top.

Timing Chain|Specifications|Page 1812 > < Timing Chain|Specifications|Page 1810