Solara Coupe L4-2.4L (2AZ-FE) (2007)
b. Install the wire harness clamp and 3 connectors.
6. INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
a. Install the instrument panel junction block assembly with the 3 nuts.
Torque: 8.4 N.m (85 kgf.cm, 73 in.lbf)
7. INSTALL INSTRUMENT PANEL BRACE SUBASSEMBLY NO.2
a. Install the instrument panel brace sub-assembly No. 2 with the 2 nuts and bolt.
b. Install the amplifier antenna assembly with the nut and clamp.