toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 2402 > < Valve Clearance|Specifications|Page 2400
Page 5
background image

(c)

Check only the valves indicated on the left.
(1) Using a feeler gauge, measure the clearance between each valve lifter and camshaft.
(2) Record valve clearance measurements that are out of the specified range. These measurements will be used later to determine the size of

the adjustment shim to be installed. 

Valve Clearance (Cold)

INSTALLATION 

1. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

(a)

Remove any old packing (FIPG) material.

(b) Apply seal packing to the 2 locations shown in the illustration.

Seal packing: Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent 

NOTICE:  
^ Remove any oil from the contact surface.
^ Install the cylinder head cover within 5 minutes after applying seal packing.
^ Do not start the engine for at least 2 hours after installing the cylinder head cover.

(c)

Install the cylinder head cover with the 8 bolts and 2 nuts.
Torque: A
11 Nm (110 kgf-cm, 8 ft. lbs.) 
B
14 Nm (143 kgf-cm, 10 ft. lbs.) 
Nut 
11 Nm (110 kgf-cm, 8 ft. lbs.) 

Valve Clearance|Specifications|Page 2402 > < Valve Clearance|Specifications|Page 2400