toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Belt > < Components|Page 1151
Page 2
background image

(f) Install the engine hanger No. 1 with the 2 bolts.

Torque: 20 Nm (199 kgf-cm, 15 ft-lbf)

(g) Install the pressure feed tube with the 3 nuts.

Torque: 7.8 Nm (80 kgf-cm, 69 in-lbf)

(h) Connect the ventilation hose.
(i) Connect the union to check valve hose.
(j) Connect the water by-pass hose No. 2.
(k) Connect the water by-pass hose No. 3.
(l) Connect the throttle motor connector.

5. INSTALL EMISSION CONTROL VALVE SET

(a) Install the valve set with the 2 nuts.
(b) Install the clamp.
(c) Connect the 2 vacuum hoses.
(d) Connect the fuel vapor feed hose No. 2.
(e) Connect the fuel vapor feed hose No. 1.

(f) Install the wire harness clamp.
(g) Connect the 2 VSV connectors.

6. INSTALL AIR CLEANER ASSEMBLY
7. INSTALL FRONT SUSPENSION UPPER BRACE CENTER (W/ FRONT SUSPENSION BRACE UPPER CENTER)

Torque: 80 Nm (816 kgf-cm, 59 ft-lbf)

8. INSTALL RADIATOR HOSE INLET
9. INSTALL V-BANK COVER SUB-ASSEMBLY

(a) Fit the 2 retainers and install the V-bank cover.
(b) Using a 5 mm socket hexagon wrench, tighten the 3 nuts.

Torque: 7.9 Nm (81 kgf-cm, 70 in-lbf)

10. INSTALL FRONT FENDER APRON SEAL RH
11. ADD ENGINE COOLANT

HINT:  (See: Fluids/Coolant/Service and Repair)

12. CHECK FOR ENGINE COOLANT LEAKS

Timing Belt > < Components|Page 1151