toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

ABS Main Relay|Locations|Page 19 > < ABS Main Relay|Locations
Page 1
background image

ABS Main Relay: Testing and Inspection

Motor Relay Continuity Check

Motor Relay Operatiion Check

Solenoid Relay Continuity Check

Solenoid Relay Operation Check

1.

Remove pump motor relay from the actuator.

2.

Inspect pump motor relay continuity.

a. Check for continuity between terminals 1 and 2.
b. Check for no continuity between terminals 3 and 4 and terminals 1 and 4.

3.

Inspect pump motor relay operation.

a. Apply 12.0 volts to terminals 1 and 2.
b. Check for continuity between terminals 3 and 4.
c. Check for no continuity between terminals 1 and 4.

NOTE: If relay fails to operate as specified, replace the relay.

4.

Remove solenoid relay from the actuator.

5.

Inspect solenoid relay continuity.

ABS Main Relay|Locations|Page 19 > < ABS Main Relay|Locations