Supra L6-3.0L DOHC Turbo (7M-GTE) (1987)
b. Connect the throttle cable to the cam.
c. Install the C(0), C(2) and B(2) accumulator piston springs with C(2) and B(2) piston spacers.
d. Install the seventeen bolts.
NOTE: Each bolt length mm) is indicated in the figure.
Torque: 100 kg.cm (7 ft.lb, 10 N.m)
2. CONNECT THE THREE CONNECTORS TO EACH SOLENOID