T100 Pickup 2WD L4-164.4 2693cc 2.7L DOHC (3RZ-FE) (1995)
-
While turning the injector left and right, install it to the delivery pipe. Install the 4 injectors.
-
Position the injector connector upward.
2. INSTALL INJECTORS AND DELIVERY PIPE.
-
Place the 4 new insulators and in position on the spacers.
-
Place the 4 injectors together with the delivery pipe in position on the cylinder head.
-
Temporarily install the 2 bolts holding the delivery pipe to the cylinder head.
-
Check that the injectors rotate smoothly.
HINT: If injectors do not rotate smoothly, the probable cause is incorrect installation of 0-rings. Replace the 0-rings.
-
Position the injector connector upward.
-
Tighten the 2 bolts holding the delivery pipe to the cylinder head.
Torque: 21 Nm (15 ft lb)
3. INSTALL THROTTLE BODY.
4. REINSTALL HIGH-TENSION CORDS TO SPARK PLUGS.
5. INSTALL NO.1 AND NO.2 PCV HOSES.
6. WITH A/C: INSTALL A/C IDLE-UP VALVE.
7. INSTALL AIR INTAKE CONNECTOR.
8. WITH M/T: CONNECT ACCELERATOR CABLE TO THROTTLE BODY.
WITH A/T: CONNECT THROTTLE AND ACCELERATOR CABLES TO THROTTLE BODY.
9. INSTALL MAF METER, RESONATOR AND AIR CLEANER CAP.
10. FILL WITH ENGINE COOLANT.
11. RECHECK ENGINE COOLANT LEVEL.