T100 Pickup 2WD L4-2.7L (3RZ-FE) (1994)
Starter Motor: Testing and Inspection
Pull-In Test
Fig. 3 Pull-in Test Connection Locations
Fig. 4 Pull-in Test Connection Locations
1.
Disconnect field coil wire from terminal C.
2.
Connect battery (+) to terminal 50 of starter, battery (-) to terminal C and starter body, Figs. 3 and 4. Pinion gear should move outward. If not,
replace magnetic switch assembly.