toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Automatic Transmission/Transaxle > < Shift Interlock Solenoid|Testing and Inspection|Page 3090
Page 1
background image

Shift Solenoid: Testing and Inspection

INSPECT SOLENOID 

(a) Disconnect the connector from the ECT computer.

   
1988 A340H/4WD

1989-93 3VZ-E A340E/A340F

1989 3VZ-E A340H/4WD

1990 A44D

1990-93 A340H

(b) Measure the resistance between (1, S1, S2, SL, S4) and ground.

STD: 11 - 15 ohms 

(c) Apply battery voltage to the solenoid.

Check that an operation noise can be heard from the solenoid.

NOTE: If there is foreign material in the solenoid valve, there will be no fluid control even with solenoid operation.

Automatic Transmission/Transaxle > < Shift Interlock Solenoid|Testing and Inspection|Page 3090