toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Instrument Cluster / Carrier > < Fuel Gauge|Testing and Inspection|Page 5500
Page 3
background image

Fig. 29 Fuel Sender Gauge Inspection.

8. Connect positive lead from voltmeter to terminal 2 and negative lead to terminal 1. Ensure voltage rises between terminals 1 and 2 as the float is

moved from top to bottom position.

9. Measure resistance between terminals 1 and 2 for each float position. Resistance should be as follows:

a. Full position: about 3.0 ohms.
b. Half position: about 32.5 ohms.
c. Empty position: about 110.0 ohms.
d. If resistance is not as specified, replace sender gauge.

Instrument Cluster / Carrier > < Fuel Gauge|Testing and Inspection|Page 5500