Tacoma 2WD L4-2.4L (2RZ-FE) (1996)
Circuit Opening Relay: Testing and Inspection
COMPONENTS FOR REMOVAL AND INSTALLATION
1. REMOVE LOWER FINISH NO.1 PANEL.
2. REMOVE CIRCUIT OPENING RELAY.
3. INSPECT CIRCUIT OPENING RELAY.
A. Inspect relay continuity.
-
Using and ohmmeter, check that there is continuity between terminals STA and E1.
-
If there is no continuity, replace the relay.
-
Check that there is continuity between terminals +B and FC.
-
If there is no continuity, replace the relay.
-
Check that there is no continuity between terminals +B and FP.
-
If there is continuity, replace the relay.
B. Inspect relay operation.
-
Apply battery positive voltage across terminals STA and E1.