toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Shift Linkage, A/T > < Shifter A/T|Adjustments|Page 4119
Page 7
background image

Torque: 14 Nm (143 kgf-cm, 10 ft. lbs.) 

b. Connect the 2 clamps and 2 connectors.

2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

a. CABLE TYPE:

1. Connect the transmission control cable with the clip to floor shift assembly.
2. Install the transmission control cable onto the floor shift assembly.

3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

a. ROD TYPE:

1. Install the floor shift gear shifting rod with nut. 

Torque: 5.5 Nm (56 kgf-cm, 49 inch lbs.) 

4. REMOVE FRONT CONSOLE BOX (for Bench Seat Type)
5. INSTALL FRONT CONSOLE BOX (for Separate Seat Type)
6. INSTALL INSTRUMENT PANEL CUP HOLDER TRAY (for Separate Seat Type)
7. INSTALL REAR CONSOLE BOX ASSEMBLY (for Separate Seat Type)
8. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY (for Separate Seat Type) 
9. ADJUST SHIFT LEVER POSITION 

10. INSPECT SHIFT LEVER POSITION 

Shift Linkage, A/T > < Shifter A/T|Adjustments|Page 4119