toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Chain|Diagrams|Page 1467 > < Timing Chain|Diagrams|Page 1465
Page 12
background image

NOTICE:  Check that No.1 cylinder is at TDC and that the weights of the No.1 and No.2 balance shafts are at the bottom side.

1. INSTALL NO.4 VIBRATION DAMPER

Install the No.4 damper with the 2 bolts.

2. INSTALL NO.2 TIMING CHAIN, NO.2 CRANKSHAFT TIMING SPROCKET, BALANCE SHAFT DRIVE GEAR AND SHAFT

a. Install the No.2 timing chain by matching its mark links with the timing marks on the No.2 crankshaft timing sprocket and balance shaft timing

sprocket.

b. Fit the other mark link of No.2 timing chain onto the sprocket behind the large timing mark of the balance shaft drive gear.
c. Insert the balance shaft drive gear shaft through the balance shaft drive gear so that it fits into the thrust plate hole.

Then align the small timing mark of the balance shaft drive gear with the timing mark of the balance shaft timing gear.

d. Install the bolt to the balance shaft drive gear and tighten it.

Torque: 25 Nm (250 kgf.cm, 18 ft. lbs.)

e. Check that each timing mark is matched with the corresponding mark link.

3. INSTALL NO.2, NO.3 VIBRATION DAMPERS AND NO.2 CHAIN TENSIONER

NOTICE:  Assemble the chain tensioner with the pin installed, then remove the pin after assembly. When doing this, avoid pushing the No.2
vibration damper against the chain.

a. Install the No.2 chain tensioner with the nut.

Torque: 18 Nm (185 kgf.cm, 13 ft. lbs.)

b. Install No.3 damper with the 2 bolts.

Torque: 18 Nm (185 kgf.cm, 13 ft. lbs.)

Timing Chain|Diagrams|Page 1467 > < Timing Chain|Diagrams|Page 1465