toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Brake Proportioning/Combination Valve|Removal and Installation|Page 4848 > < Brake Proportioning/Combination Valve|Removal and Installation
Page 2
background image

4. Set rear axle load.
5. Set valve body.

(a) When pulling down the load sensing spring, confirm that the valve piston moves down smoothly.

(b) Position the valve body so that the valve piston lightly contacts the load sensing spring.
(c) Tighten the valve body mounting nuts. 

Torque: 13 Nm (9 ft. lbs.)

6. Bleed brake system. See: Brake Bleeding/Service and Repair
7. Check and adjust LSP & BV fluid pressure.

Brake Proportioning/Combination Valve|Removal and Installation|Page 4848 > < Brake Proportioning/Combination Valve|Removal and Installation