Tacoma PreRunner V6-4.0L (1GR-FE) (2006)
a. Remove the attached vinyl tape from the pipe and the connecting part of the cooler condenser assembly.
b. Apply sufficient compressor oil to a new seal washer and the fitting surface of the pipe joint.
Compressor oil: RL-897 or equivalent
c. Install the seal washer onto the air conditioning tube assembly.
d. Install the air conditioning tube assembly onto the cooler condenser assembly with the bolt.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)
3. INSTALL DISCHARGE HOSE SUB-ASSEMBLY
a. Remove the attached vinyl tape from the hose and the connecting part of the cooler condenser assembly.
b. Apply sufficient compressor oil to a new seal washer and the fitting surface of the hose joint.
Compressor oil: RL-897 or equivalent
c. Install the seal washer onto the discharge hose subassembly.
d. Install the discharge hose sub-assembly onto the cooler condenser assembly with the bolt.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)
4. INSTALL RADIATOR ASSEMBLY (for 2TR-FE)
5. INSTALL RADIATOR ASSEMBLY (for 1GR-FE)
6. INSTALL FAN SHROUD (for 2TR-FE)
7. INSTALL FAN SHROUD (for 1GR-FE)
8. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH (for 2TR-FE)
9. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH (for 1GR-FE)
10. INSTALL RADIATOR GRILLE
11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf)
12. ADD ENGINE COOLANT (for 2TR-FE)
13. ADD ENGINE COOLANT (for 1GR-FE)
14. CHECK FOR ENGINE COOLANT LEAKAGE (for 2TR-FE)
15. CHECK FOR ENGINE COOLANT LEAKAGE (for 1GR-FE)
16. CHARGE REFRIGERANT
17. WARM UP ENGINE
18. CHECK FOR REFRIGERANT LEAKAGE