b. Using an 8 mm socket hexagon wrench, install the 4 bolts.

Torque: 28 N.m (286 kgf.cm, 21 ft.lbf)

c. Install the 3 upper bolts which are used to secure the 2 surge tank stays and throttle body bracket.

Torque: 21 N.m (214 kgf.cm, 16 ft.lbf)

d. Install the 3 wire harness clamps and hose clamp.
e. Connect the throttle motor connector.
f.

Connect the 2 VSV connectors.

g. Connect the ventilation hose.
h. Connect the fuel vapor feed hose.
i.

Connect the water by-pass hose No. 4.

j.

Connect the water by-pass hose No. 5.

6. INSTALL AIR CLEANER ASSEMBLY
7. INSTALL V-BANK COVER
8. CONNECT CONNECT BATTERY NEGATIVE TERMINAL

Torque: 3.9 N.m (40 kgf.cm, 35 in.lbf)

9. ADD ENGINE COOLANT

10. CHECK FOR ENGINE COOLANT LEAKAGE
11. CHECK FOR FUEL LEAKAGE