Tacoma PreRunner V6-4.0L (1GR-FE) (2006)
4. ADD ENGINE COOLANT
5. CHECK FOR ENGINE COOLANT LEAKAGE
6. INSTALL V-BANK COVER
a. Install the V-bank cover with the 2 nuts.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)
4. ADD ENGINE COOLANT
5. CHECK FOR ENGINE COOLANT LEAKAGE
6. INSTALL V-BANK COVER
a. Install the V-bank cover with the 2 nuts.
Torque: 7.5 N.m (76 kgf.cm, 66 in.lbf)