toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Torque Converter Bolt Installation Precautions|Page 2249 > < A/T - Torque Converter Bolt Installation Precautions|Page 2247
Page 1
background image

Torque Converter: Testing and Inspection

INSPECTION 

1. INSPECT ONE-WAY CLUTCH

a. Install SST in the inner race of the one-way clutch.

SST 09350-20015 (09397-22020)

b. Install SST so that it fits in the notch of the converter hub and outer race of the one-way clutch.

SST 09350-20015 (09397-22020)

c. With the torque converter clutch held upright, the clutch should lock when turned counterclockwise, and rotate freely and smoothly clockwise.

If necessary, clean the converter clutch and retest the clutch. Replace the converter clutch if the clutch still fails the test.

2. MEASURE DRIVE PLATE RUNOUT AND INSPECT RING GEAR

Set up a dial indicator and measure the drive plate runout.
Maximum runout: 0.20 mm (0.0079 inch) 
If runout is not within the specification or if the ring gear is damaged, replace the drive plate.
If installing a new drive plate, note the orientation of spacers and tighten the bolts.
Torque: 74 Nm (750 kgf-cm, 54 ft. lbs.) 

3. MEASURE TORQUE CONVERTER CLUTCH SLEEVE RUNOUT

Temporarily mount the torque converter clutch to the drive plate. Set up a dial indicator and measure the torque converter clutch sleeve runout.
Maximum runout: 0.30 mm (0.0118 inch) 
If runout is not within the specification, try to correct by reorienting the installation of the converter. 

A/T - Torque Converter Bolt Installation Precautions|Page 2249 > < A/T - Torque Converter Bolt Installation Precautions|Page 2247