toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Universal Joint, Drive/Propeller Shaft|Removal and Installation|Page 3489 > < Universal Joint, Drive/Propeller Shaft|Removal and Installation|Page 3487
Page 3
background image

1. INSTALL CENTER SUPPORT BEARING ON INTERMEDIATE SHAFT

HINT:  Install the center support bearing in the direction, as shown.

2. INSTALL CENTER YOKE ON INTERMEDIATE SHAFT

a. Coat the splines of the intermediate shaft with MP grease.
b. Install the spacer.

c. Place the center yoke on the shaft and align the matchmarks.

HINT:  If replacing either the center yoke or intermediate shaft, reassemble them so that the front side yoke of the intermediate shaft and the
center yoke are facing in the same direction.

d. Install the spacer.
e. Clamp the yoke in a vise, press the bearing into position by tightening down a new nut.

Torque: 181 Nm (1,845 kgf-cm, 133 ft. lbs.)

f.

Loosen the nut.

g. Torque the nut again.

Torque: 82 Nm (835 kgf-cm, 60 ft. lbs.)

h. Using a hammer and punch, stake the nut.

3. CONNECT PROPELLER SHAFT AND INTERMEDIATE SHAFT 

Assemble center yoke.

Universal Joint, Drive/Propeller Shaft|Removal and Installation|Page 3489 > < Universal Joint, Drive/Propeller Shaft|Removal and Installation|Page 3487