toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Alternator|Removal and Installation|Page 4517 > < Alternator|Removal and Installation|Page 4515
Page 5
background image

Torque: 43 N.m (438 kgf.cm, 32 ft.lbf) 

b. Install the wire harness clamp bracket with the 2 bolts.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf) 

c. Connect the wire harness.

1. Connect the wire harness to the terminal B and install the nut.

Torque: 9.8 N.m (100 kgf.cm, 7 ft.lbf) 

2. Connect the connector to the generator assembly.
3. Install the wire harness stay with the bolt.

Torque: 8.0 N.m (82 kgf.cm, 71 in.lbf) 

2. INSTALL BATTERY
3. INSTALL FAN AND GENERATOR V BELT
4. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.1

Install the engine under cover sub-assembly No.1 with the 4 bolts.

Torque: 29 N.m (296 kgf.cm, 21 ft.lbf) 

5. INSTALL V-BANK COVER

Install the V-bank cover with the 2 nuts.

Torque: 9.8 N.m (100 kgf.cm, 87 in.lbf)

Alternator|Removal and Installation|Page 4517 > < Alternator|Removal and Installation|Page 4515