toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3344 > < Initial Inspection and Diagnostic Overview|Page 3342
Page 18
background image

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

NG --  REPAIR OR REPLACE CAN MAIN WIRE CONNECTED TO COMBINATION METER ECU (CANH, CANL)

OK --  REPLACE COMBINATION METER ASSEMBLY 

14. CHECK FOR SHORT IN CAN BUS WIRES (MAIN BODY ECU)

(a) Disconnect the J2 main body ECU connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

NG --  REPAIR OR REPLACE CAN BRANCH WIRE CONNECTED TO MAIN BODY ECU (CANH, CANL)

OK --  REPLACE MAIN BODY ECU

15. CHECK FOR SHORT IN CAN BUS WIRES (SKID CONTROL ECU WITH ACTUATOR)

(a) Disconnect the A17 skid control ECU with actuator connector.

Initial Inspection and Diagnostic Overview|Page 3344 > < Initial Inspection and Diagnostic Overview|Page 3342