Tundra 2WD V8-4.6L (1UR-FE) (2010)
Power Distribution Module: Service and Repair
Installation
OTHER SYSTEM: VOLTAGE INVERTER (for CrewMax): INSTALLATION
1. INSTALL VOLTAGE INVERTER ASSEMBLY
(a) Connect the voltage inverter connector.
(b) Install the voltage inverter with the 2 bolts.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
2. INSTALL LOWER QUARTER TRIM PANEL ASSEMBLY LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Roof Headlining (for CrewMax)/Installation
3. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP LH
4. INSTALL REAR DOOR SCUFF PLATE LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Roof Headlining (for
CrewMax)/Installation
5. INSTALL BACK PANEL TRIM LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Roof Headlining (for
CrewMax)/Installation
6. INSTALL BACK PANEL TRIM RH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Roof Headlining (for
CrewMax)/Installation