toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3544 > < Initial Inspection and Diagnostic Overview|Page 3542
Page 80
background image

INSPECTION PROCEDURE

PROCEDURE

1. CHECK HARNESS AND CONNECTOR (ECM - BATTERY AND BODY GROUND)

(a) Disconnect the A24 and D74 ECM connectors.

(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

(c) Measure the voltage according to the value(s) in the table below.

Standard voltage:

Initial Inspection and Diagnostic Overview|Page 3544 > < Initial Inspection and Diagnostic Overview|Page 3542