toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Air Switching Valve (for Bank 1)|Page 4014 > < Air Switching Valve (for Bank 1)
Page 2
background image

(b) Remove the 2 bolts.

(c) Remove the 3 bolts, air switching valve and gasket.

NOTICE:
Be careful not to damage the installation surface of the gaskets.

Installation

1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 1): INSTALLATION

1. INSTALL AIR SWITCHING VALVE ASSEMBLY

(a) Install a new gasket and the air switching valve with the 3 bolts.

Torque : 24 Nm (245 kgf-cm, 18 ft-lbf)

NOTICE:
Make sure the gasket's claws are not caught between the air switching valve and No. 4 air tube.

(b) Install the 2 bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

(c) Connect the wire harness clamp bracket with the bolt.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

2. CONNECT NO. 2 AIR HOSE

(a) Align the paint mark with the projection and connect the No. 2 air hose.

Air Switching Valve (for Bank 1)|Page 4014 > < Air Switching Valve (for Bank 1)