Tundra 4WD V8-4.6L (1UR-FE) (2010)
Canister Purge Control Valve: Service and Repair
Installation
1UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION
1. INSTALL PURGE VSV
(a) Install the purge VSV with the bolt.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the connector.
2. CONNECT PURGE LINE HOSE
(a) Connect the 2 hoses.
HINT
Turn the claw of the clip to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation