toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Removal and Replacement|Page 5302 > < Removal and Replacement|Page 5300
Page 14
background image

(c) Align the matchmarks on the joint yoke and intermediate shaft.

(d) Install the washer.

(e) Clamp the yoke in a vise, and press the bearing into position by installing a new lock nut.

Torque : 128 Nm (1305 kgf-cm, 94 ft-lbf)

(f) Loosen the lock nut.

(g) Tighten the lock nut again.

Torque : 128 Nm (1305 kgf-cm, 94 ft-lbf)

(h) Using a chisel and hammer, stake the lock nut.

3. INSTALL REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING (for 3 Joint Type)

(a) Apply MP grease to a new spider and 4 new bearings.

NOTICE:
Be careful not to apply too much grease.

(b) Measure dimension A between the snap ring grooves.

(c) Install the 4 spider bearings to the spider journal portions, and then measure dimension B of the universal joint.

Removal and Replacement|Page 5302 > < Removal and Replacement|Page 5300