toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Symptom Related Diagnostic Procedures|Page 5266 > < Symptom Related Diagnostic Procedures|Page 5264
Page 2
background image

2. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY (for 3 Joint Type)

(a) Using a dial indicator, measure the intermediate shaft runout.

Maximum runout:

0.61 mm (0.0240 in.)

*

If the intermediate shaft runout is more than the maximum, replace the propeller with center bearing shaft assembly.

(b) Using a dial indicator, measure the propeller shaft runout.

Maximum runout:

1.02 mm (0.0402 in.)

*

If the propeller shaft runout is more than the maximum, replace the propeller with center bearing shaft assembly.

3. INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING

(a) Mount the propeller shaft in a vise.

NOTICE:
Be careful not to grip the propeller shaft tube too tightly in a vise as this will cause deformation.

(b) Inspect the spider bearing for wear or damage.

(c) Using a dial indicator, measure the spider bearing axial play by turning the yoke of the flange while holding the shaft tightly.

Maximum runout:

0.05 mm (0.00197 in.)

*

If the spider bearing axial play is more than the maximum, replace the spider bearing.

Symptom Related Diagnostic Procedures|Page 5266 > < Symptom Related Diagnostic Procedures|Page 5264