Tundra 4WD V8-4.7L (2UZ-FE) (2003)
h. Turn SST (B), and remove SST (A and B).
5. INSTALL RECTIFIER HOLDER
a. Install the 4 rubber insulators on the lead wires.
NOTE: Be careful of the rubber insulators installation direction.
b. Install the rectifier while pushing it with the 4 screws.
Torque: 1.96 N.m (20 kgf.cm, 17 in.lbf)
6. INSTALL BRUSH HOLDER AND VOLTAGE REGULATOR
a. Place the seal plate on the rectifier end frame.
b. Place the voltage regulator and brush holder on the rectifier end frame.