Tundra 4WD V8-5.7L (3UR-FE) (2007)
Canister Purge Control Valve: Service and Repair
REMOVAL
1. REMOVE V-BANK COVER
2. DISCONNECT PURGE LINE HOSE
a. Disconnect the 2 purge line hoses.
3. REMOVE PURGE VSV
a. Disconnect the connector.
b. Remove the bolt and purge VSV.
INSTALLATION
1. INSTALL PURGE VSV
a. Install the purge VSV with the bolt.
Torque: 21 N.m (214 kgf. cm, 15 ft.lbf)
b. Connect the connector.
2. CONNECT PURGE LINE HOSE
a. Connect the 2 hoses.
HINT: Turn the clip claw to the upper side.
3. INSTALL V-BANK COVER